21
5. To remove links from each platform chain, do
the following. Raise platform to a comfort-
able work height (FIG. 21-1A). Support the
bottom of platform to remove tension from
LH and RH chains. Next, unfasten both u-
bolts from platform (FIG. 21-1B). Remove
a 1 or 2 links (as required) from both chains.
Then, fasten u-bolts to platform as shown in
(FIG. 21-1C). Tighten jam nuts securely.
PLATFORM RAISED &
SUPPORTED
FIG. 21-1A
SUPPORT
RH CHAIN
NOTE: Remove links from platform
chains only if required. Skip
instruction 5 if u-bolts raised
tip of the platform (or retention
ramp) to correct height.
1/8”
(MIN)
U-BOLTS FASTENED TO PLATFORM
(RH SIDE OF PLATFORM SHOWN)
FIG. 21-1C
LOCK NUT
(2 PLACES)
PLATFORM
JAM NUT
(2 PLACES)
REMOVING CHAIN LINK
FIG. 21-1B
LOCK NUT &
FLAT WASHER
(2 PLACES)
JAM NUT &
FLATWASHER
(2 PLACES)
U-BOLT
CHAIN LINK 1
(REMOVE)
U-BOLT
CHAIN LINK 2
(REMOVE IF
REQUIRED)